On This Foundation…

I was talking timeline & schedule of this project with our architect Paul Nelson yesterday. Our dream is to be sleeping in our new bedroom by Christmas. Paul cautioned me to not be that optimistic and to plan on the build to take a full 6 months. He equated it to a funnel: Lots of big things happening at the start. Then, the devil is in the details.

IMG_2348

Max & Daphne look on while I’m stuck in a rut.

IMG_2377

Measure twice, pour once. 10″ wide channel of concrete for which to place the block.

After the concrete had a couple of days to cure, the block walls began to take shape.

IMG_2403

Measuring. Leveling. Mortaring. #notyourtypicallegos

Within two days, the walls were done. Next, we were visited by spacemen. There was no probing. They simply sprayed black goo on the walls & vanished into thin air.

IMG_2409

At this point, we wait until the concrete floor can be poured. The concrete contractor isn’t available for another week. This is the sort of thing that makes our “Christmas Wish” seem pretty far fetched. In the meantime, I’ll be practicing my parkour. IMG_2416

Leave a comment